The Cedar Suite at The Grove

Case study · Hotel

The Cedar Suite at The Grove

For more than six years the Cedar Suite has relied on one concealed system to keep weddings, banquets and conferences comfortable.

Sector
Hotel and leisure
Location
The Grove, Hertfordshire
Use
Weddings, banquets and conferences
Air handlers
Three 25 kW units
Outlets
25 mm linear and 66 mm round
01

The challenge

The Cedar Suite is a leading event venue, with an interior by designer Martin Hulbert and floor-to-ceiling windows that flood the room with daylight. The climate system had to meet demanding targets for appearance, comfort and energy efficiency across very different events.

02

The solution

Three vertically mounted 25 kW air handlers provide heating and cooling. Two feed discreet 25 mm linear grilles and slot outlets around the inner coffered ceiling; the third supplies 66 mm round outlets around the edge of the room, directed down the full-height glass. Tempered fresh air is delivered through the same outlets.

03

The result

Temperatures stay even and draught-free with no hot or cold spots. Maintenance demands are low and are carried out from the plant room, away from the event space. The hotel’s facilities team describe the system as visually discreet and very quiet.

“Invisible.AC system is a designer’s dream; visually discreet, very quiet and unnoticeable – the perfect complement to Martin Hulbert’s vision.”

Robert Kenworthy, Group Facilities Director, Ralph Trustees

Installed in collaboration with Invisible.AC. Photography courtesy of Invisible.AC.

Speak to a specialist

Planning a similar project?

Tell us about your property and we will advise on what is possible.

Arrange a consultation020 4629 4896

All case studies